• chiliedogg@lemmy.world
    link
    fedilink
    English
    arrow-up
    3
    ·
    27 days ago

    Septic and Drainage should come before any kind of detailed architecture. It’ll save you 30 grand in Engineering revisions if you don’t have to re-do the drainage plans.

    Also, never let an architect be in charge of a project. It’s like having the font designer be in charge of office software.