• frezik@midwest.social
    link
    fedilink
    arrow-up
    0
    ·
    5 months ago

    No, you just pay out the nose up front.

    If I had money to invest in the energy sector, I don’t know why I should pick nuclear. It’s going to double its budget and take 10 years before I see a dime of return. Possibly none if it can’t secure funding for the budget overrun, as all my initial investment will be spent.

    A solar or wind farm will take 6-12 months and likely come in at or close to its budget. Why the hell would I choose nuclear?

      • frezik@midwest.social
        link
        fedilink
        arrow-up
        0
        ·
        5 months ago

        Then we just move the problem. Why should we do something that’s going to take longer and use more labor? Especially skilled labor.

        Money is an imperfect proxy for the underlying resources in many ways, but it about lines up in this case. To force the issue, there would have to be a compelling reason beyond straight money.

        That reason ain’t getting to 100% clean energy in a short time. There is another: building plants to use up existing waste rather than burying it.

        • someacnt_@lemmy.world
          link
          fedilink
          arrow-up
          0
          ·
          5 months ago

          Wdym skilled labor? I mean, nuclear mostly take bog standard constructions and the experts cannot be “repurposed” for renewables as well.

          • frezik@midwest.social
            link
            fedilink
            arrow-up
            0
            ·
            5 months ago

            Nuclear is nothing bog standard. If it was, it wouldn’t take 10 years. Almost every plant is a boutique job that requires lots of specialists. The Westinghouse AP1000 reactor design was meant to get around this. It didn’t.

            The experts can stay where they are: maintaining existing nuclear power.

            Renewables don’t take much skilled labor at all. It’s putting solar panels on racks in a field, or hoisting wind blades up a tower (crane operation is a specialty, but not on the level of nuclear engineering).

            • someacnt_@lemmy.world
              link
              fedilink
              arrow-up
              0
              ·
              edit-2
              5 months ago

              I mean, it seems normal for big structure constructions to take 5 years at least…

              About bog standard construction, I meant not standardized nuclear, but that many parts of it is just constructions

              • frezik@midwest.social
                link
                fedilink
                arrow-up
                0
                ·
                5 months ago

                And 5 years is what nuclear projects have promised at the start over the years. Everyone involved knows this is a gross lie.

                  • frezik@midwest.social
                    link
                    fedilink
                    arrow-up
                    0
                    ·
                    5 months ago

                    China built a few Ap1000 designs. The Sanmen station started in 2009 with completion expected in 2014 (2015 for the second unit). It went into 2019. The second, Haiyang, went about the same.

                    This is pretty similar to what happened in the US with Volgte.